Documents
Source:Google Drive·SAMPLE
← Back to Documents
EOS Level 10 meeting cheat sheet (Output Systems flavor)
used every client L10
Occurred
Jul 3
Type
document
One-page reference for running a Level 10: Segue (5 min), Scorecard (5 min), Rock Review (5 min), Customer/Employee Headlines (5 min), To-do List (5 min), IDS — Identify, Discuss, Solve (60 min), Conclude with Cascading Messages, Rating, and Recap (5 min). Includes the modifications Output Systems makes: keep the meeting to 60 min for smaller teams, always time-box IDS to protect the last 5 min, and require every to-do to have a name and a date.